Team Report
description producers & consumers template example
Description top
Preparation
A Team Report is prepared for the Project Manager of a non-PRINCE2™ Project, at a frequency defined in a Phase Plan or a Workpackage. It describes the status of the work for each member of a Team. It should cover all the work of the Team which might be:
- a single Workpackage
- several Workpackages
- all the Workpackages in a current Phase.
It will consolidate for a Workpackage or Phase the most recent Activity Status Reports (ASR) and Workpackage Status Reports (WSR) that are available. These will be:
- the final report for an Activity or Workpackage that has been closed
- for every Activity that is currently open, a newly-prepared ASR, which a Team Manager or Workpackage Manager will receive from the members of his/her Team
- For every Workpackage that is currently open a newly-prepared WSR which a Workpackage Manager or Team Manager will prepare from the ASRs delivered by the Activity Managers in his/her Team
- an initial Report for each Workpackage and/or Activity that has yet to be started.
Contents
The consolidation could be for a Phase, for several Workpackages, or for a single Workpackage. This will depend on the Work Breakdown Structure (WBS), and the work delegated to the Team. Starting with the Activities, a Team Report will build up a statement for each item in the Work Unit delegated to the Team of:
- its summary status (usually reported as Red, Amber or Green, with appropriate comments)
- a forecast for its date of completion (versus Plan)
- a forecast of the effort needed to complete the item, together with the effort spent to date and the total effort provided by the Plan.
Supplementary information and comments on Quality, Risks, Issues and deviations from Tolerances may be included as required.
Report structure
It is common practice for the structure of a Project Status Report to reflect the Work Breakdown and the delegation of work. So typically, there will be a Team Report for each Workpackage in a Phase Plan.
Format and use of the report
A Team Report may be a simple verbal report, it could be provided as a Word document (for example on a large or complex Project, or as an email, (see Template below).
The next step
Team Reports will be consolidated into the Phase Status Report for the Phase(s) that are currently open. For a non-PRINCE2™ Project this will be the next step in the assembly of a Project Status Report.
Producers and Consumers top
Producers |
Consumers |
|
Templatetop
The following Product Templates are available:
- for non-PRINCE2™ Projects
- a Word skeleton document called "Team Report"
- an Excel form called "Phase Status Table" whose layout is compatible with that of an Activity Status Report and a Workpackage Status Report. This Template is one of an integrated set, which supports the use of copy and paste, to simplify the upwards consolidation of Status Reports
- an Excel form called "Workpackage Status Table", whose layout is compatible with that of an Activity Status Report. This Template is one of an integrated set, which supports the use of copy and paste, to simplify the upwards consolidation of Status Reports
- an Excel form called "Activity Status Report". This Template is one of an integrated set, which supports the use of copy and paste, to simplify the upwards consolidation of Status Reports.
Example top
None